The Ebor BESS project is a 100 megawatt (MW), 8-hour duration utility-scale battery energy storage system proposed to be constructed near the town of Ebor in the New England region of NSW. The project holds a 14-year Long-Term Energy Service Agreement (LTESA) under the NSW Electricity Infrastructure Roadmap. In addition to the battery facility, the project includes an on-site substation and grid connection infrastructure, along with the associated electrical and civil works required to construct, operate and maintain the facility.