Transgrid has contracted the HumeLink East Joint Venture (Acciona Construction Australia Pty Ltd and Genus Infrastructure (NSW) Pty Ltd) to deliver the eastern portion of the HumeLink project.
The project involves the expansion of the existing Bannaby 500 kV substation, along with the design and construction of a new 500 kV double circuit transmission line. This new transmission line will connect the Bannaby 500 kV substation at the Wondalga interface point with HumeLink West.